Data Center Approval: What Should a County Require?

By Joel Yonkman

Most counties now asked to approve a data center are writing the rules as the applications arrive. The questions at the hearing tend to be about noise, water, power lines and tax revenue. The question that matters most to the fire chief and the emergency manager is simpler: when something goes wrong inside that building, who responds, with what, and what will they find when they get there?

In our work with host communities, the answer is settled far more cheaply before approval than after the doors open. Once a site plan is approved, the county's leverage is mostly gone. This article sets out what county emergency managers, fire chiefs and planning staff should require before a data center is approved, and how to make those requirements stick.

For the full checklist of twelve permit conditions, a timeline and the questions to ask at the hearing, download the white paper: Before the Vote: Emergency Services Conditions for Data Center Approvals (PDF).

Why does the approval stage matter so much?

The scale is growing fast. Data centers used about 176 terawatt-hours in 2023, roughly 4.4 percent of U.S. electricity, and could reach up to 12 percent by 2028, according to the Lawrence Berkeley National Laboratory figures summarized by the Congressional Research Service. Much of that growth is landing in rural and exurban counties served by small career, combination or volunteer departments.

Ordinances are catching up unevenly. In Georgia, the Bainbridge-Decatur County Zoning and Planning Commission approved draft data center ordinances earlier this month with detailed limits on noise, buffers, setbacks and decommissioning, while the fire section asks developers to provide information about fire protection, as The Post-Searchlight reported on Nov. 12. Information is a starting point. It is not a plan the local fire department has accepted.

What can go wrong: the lesson from Daejeon

On Sept. 26, 2025, a lithium-ion battery pack caught fire at South Korea's National Information Resources Service data center in Daejeon during a precautionary relocation of aging batteries by contractors, according to Uptime Institute. Hundreds of government systems went down.

The government's audit, released Sept. 7, 2026, is worth reading for anyone approving a data center. As The Korea Times reported, the Board of Audit and Inspection found that unlicensed subcontractors did the battery work without shutting off power to the rack; that five months earlier the facility had turned away a fire safety inspection because the server rooms were a security zone; and that once the fire started, the center asked firefighters not to spray water on the equipment. Full restoration took 95 days, and the audit put the total cost at 351.1 billion won, including social costs.

None of those failures was about fire code text. Each was about access, authority and agreements made in advance. Those are exactly the items a county can require at approval.

What should a county require before approving a data center?

A useful model is the 2026 Data Center Ordinance Guide prepared in April 2026 by the Chester County and Montgomery County Planning Commissions in Pennsylvania. Drawing on it and on what we see in host communities, these are the conditions we recommend settling before approval.

1. An emergency response plan the fire department and EMS have accepted

The Pennsylvania guide calls for an emergency response plan, prepared by a qualified professional and submitted with the application, that evaluates the project's effect on emergency services and must be acceptable to the local fire department and EMS. It should cover fire suppression, containment, ventilation and evacuation. The word that matters is acceptable: the responders who will carry the plan get a say before the vote, not after.

2. Battery storage built to NFPA 855, with battery-specific suppression

Uninterruptible power systems and battery rooms are the hazard most departments have the least experience with. The guide requires battery storage to show compliance with NFPA 855 or a similar standard and to include fire suppression designed for batteries. Ask the applicant to identify the battery chemistry, where the rooms are, how responders reach them, and how a battery fire will be handled when water on the equipment is a question the operator may raise in the moment.

3. Inspection access and a 24-hour contact with authority

Daejeon shows what happens when security rules outrank fire safety. Make annual fire safety inspections a condition, as the guide does, and write pre-incident planning visits by the fire department into the approval. Require 24-hour emergency contact signage at the main entrance and a named on-site contact with authority to open any door and shut down any system.

4. Radio coverage inside the buildings

Large concrete and steel buildings swallow portable radio signals. The guide requires the applicant to work with the municipal emergency management coordinator to confirm in-building radio coverage for responders and to install enhancement systems if needed. Test it before occupancy, with the county's own radios.

5. Training paid for by the applicant, and exercised

The guide places the cost of system-specific first responder training on the applicant. We would add one step: a tabletop or walk-through exercise with fire, EMS, law enforcement and site staff before opening day, repeated annually and whenever the site adds a building or a battery system.

6. Generators, fuel, access and water for firefighting

Expect diesel generators and on-site fuel. The guide requires annual generator testing with reports to the municipality and secondary access suitable for emergency response. Its water provisions address cooling demand, so settle firefighting water supply separately with the fire department and water provider.

7. Control of contractors doing high-hazard work

The Daejeon fire began during contractor battery work. Ask the applicant to describe how it will verify contractor licensing and control hazardous maintenance, including notifying the fire department before major battery replacement or relocation.

How does a county make these requirements stick?

Put them in conditions of approval or a development agreement, with annual reporting, rather than in testimony or a letter of intent. Tie occupancy to a passed radio test and an accepted emergency response plan. Name who on the county side signs off: usually the fire chief, the emergency management director and the EMS medical director. And plan for staffing: if the site will change the department's call volume or hazard profile, that conversation belongs in the approval process.

Frequently asked questions

Does the fire code already cover data centers?

Adopted fire and building codes set minimums for construction and systems. They do not, by themselves, give the local department an accepted response plan, inspection access, training or radio coverage. Those come from the approval conditions.

Who should review a data center application for emergency services?

At a minimum, the fire chief or fire marshal, the county emergency management director and EMS leadership, before the planning commission votes.

What is NFPA 855?

It is the National Fire Protection Association standard for installing stationary energy storage systems, including the large battery systems many data centers use for backup power.

Can a small county ask the applicant to pay for training?

Yes. Model ordinances such as the Pennsylvania guide make applicant-funded first responder training a requirement. Check with county counsel on how your jurisdiction can structure it.

Talk with us before the vote

ERGSS helps host counties, fire departments and developers settle these questions before a site plan is approved: emergency response plans, battery storage fire planning, pre-incident planning and exercises. See our critical infrastructure and preparedness services. If a data center application is on your agenda, write to info@ergss.com or call (202) 978-2666.

Joel Yonkman is the founder of ERGSS (Emergency Response & Global Security Solutions). He is a paramedic and emergency manager who served as Planning Section Chief on FEMA Region VI's Incident Management Assistance Team and worked major responses including Deepwater Horizon. More at joelyonkman.com.